With repairs out of the way, the UK-based upstream oil and gas player Serica Energy has revealed the progress made in resuming production from its assets in the North Sea, as wheels are in motion to bring a floating production, storage, and offloading (FPSO) vessel on the UK Continental Shelf (UKCS) back online.
Following the shutdown of production in the aftermath of Storm Éowyn at Serica’s Triton cluster , which is achieved via the Dana Petroleum -operated FPSO Triton , the extent of damage the storm caused to one of the cargo tanks led to the conclusion that the vessel needed to be repaired.
