Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›South Korea’s first specialized HVDC installation vessel to be built by Turkish shipyard
Business & Finance

July 1, 2025 · about 1 year ago

South Korea’s first specialized HVDC installation vessel to be built by Turkish shipyard

South Korean subsea cable installation company LS Marine Solution has signed a contract with Türkiye’s Tersan Shipyard for the construction of its new, ultra-large cable laying vessel (CLV). To expand orders for large-scale HVDC and offshore wind projects, both domestic and in Europe and North Ameri

2 minutes read
  • LinkedIn
  • X
  • Email
South Korea’s first specialized HVDC installation vessel to be built in Türkiye

South Korean subsea cable installation company LS Marine Solution has signed a contract with Türkiye’s Tersan Shipyard for the construction of its new, ultra-large cable laying vessel (CLV).

To expand orders for large-scale HVDC and offshore wind projects, both domestic and in Europe and North America, LS Marine Solution, as announced last month , is investing KRW 345.8 billion (approximately €221 million) in a CLV with a load capacity of 13,000 tons.

The agreement with Tersan Shipyard was officially signed on June 28 in Istanbul by the shipyard’s Chairman of the Board Nurettin Paksu and LS Marine Solution CEO Kim Byung-ok.

The vessel was designed by Norwegian Salt Ship Design and will be 148.4 meters long and 31 meters wide, offering accommodation for up to 100 personnel.

Capable of simultaneously laying HVDC submarine cables and fiber optic cables, the CLV will be one of the world’s top five in terms of cable loading capacity and the largest in Asia, as well as Korea’s only specialized HVDC installation vessel, according to LS Marine Solution.

Vessel construction is expected to take about three years, with operations scheduled to begin in 2028.

When announcing the investment, LS Marine Solution said the new installation vessel was being built to strengthen its technological capabilities in response to the West Coast HVDC Energy Highway, for which the new CLV is the only alternative among domestic vessels capable of long-distance, continuous cable laying.

West Coast HVDC Energy Highway is a large-scale grid connection project proposed to be built in South Korea by 2040 to transmit 20 GW of offshore wind, expected to be installed in the country by that time, to key industrial areas. If approved to go ahead, the construction of the project would start by 2030.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceBusiness Developments & ProjectsOutlook & StrategyProject & TendersTransitionVesselsVision

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

10 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

10 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

10 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

10 days ago