Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business Developments & Projects›Equinor hires Aker Solutions for North Sea subsea tie-in project
Business Developments & Projects

July 9, 2025 · about 1 year ago

Equinor hires Aker Solutions for North Sea subsea tie-in project

Norway’s energy giant Equinor has selected compatriot Aker Solutions for work on a subsea development that will combine multiple discoveries in the northern part of the North Sea.

2 minutes read
  • LinkedIn
  • X
  • Email
Troll C platform in North Sea; Source: Equinor

Norway’s state-owned energy giant Equinor has selected compatriot Aker Solutions for work on a subsea development that will combine multiple discoveries in the northern part of the North Sea.

Under the new contract, Aker Solutions will be in charge of preparing the topside of the Troll C platform to receive and process the production from the Fram Sør subsea tie-in project. The scope includes engineering, procurement, construction, installation, and commissioning (EPCIC), as well as services for the new subsea templates.

The Norwegian firm describes this as a sizeable contract, a designation it uses for contracts valued between NOK 0.5 billion and NOK 1.5 billion, or approximately $49 million to $150 million. The work will start immediately, with production targeted for the end of 2029.

Fram Sør is located in the northern part of the North Sea, approximately 20 kilometers north of Troll C. The water depth in the area is approximately 350 meters, and the reservoir depth is 1800–2800 meters.

This is a subsea development with 4 x 4 subsea templates, which will be tied back to existing Fram infrastructure and Troll C for processing and export. According to Equinor, twelve wells are planned for start-up, and four well slots will be available for later development in the Fram/Troll area.

Aker Solutions’ Bergen office handled the front-end engineering and design (FEED) for the project. With assistance from the Mumbai office, the Bergen team will now be in charge of the project management, detailed engineering, procurement, and shop engineering. Fabrication will take place at the company’s yard in Egersund.

Equinor disclosed the submission of a plan for development and operation (PDO) of Fram Sør at the end of June, noting that the project would enable more oil and gas to be sent to Europe from the Fram and Troll area. The Fram partners are Equinor Energy (45%), Vår Energi (40%), and Inpex Idemitsu Norge (15%).

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business Developments & ProjectsProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

16 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

16 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

16 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

16 days ago