Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo
Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Fossil Energy›Brazilian oil field months away from production peak as two more wells come back online
Fossil Energy

July 22, 2025 · about 1 year ago

Brazilian oil field months away from production peak as two more wells come back online

Brazilian oil and gas player Brava Energia has returned to production mode two additional wells at an oil field off the coast of Brazil.

2 minutes read
  • LinkedIn
  • X
  • Email
FPSO Atlanta; Source: Brava Energia
FPSO Atlanta; Source: Brava Energia

Brazilian oil and gas player Brava Energia has returned to production mode two additional wells at an oil field off the coast of Brazil.

After replacing FPSO Petrojarl I , a provisional production system that worked at the Atlanta field , the FPSO Atlanta started production on December 31, 2024 , with four wells – 4H, 5H, 6H, and 7H – on stream by July 2025.

Related Articles

Fossil Energy

Brazilian oil field’s FPSO two wells richer with another duo slated for June

2 min read

Brava enriched the output from the Atlanta field with the connection of wells 2H and 3H during the second week of this month. These wells are currently undergoing testing and a stabilization process. Both wells were previously producing through the FPSO Petrojarl I.

The restart of these wells came shortly after Brava hired McDermott to perform the transportation and installation of flexible pipelines, umbilicals, and associated subsea equipment for two new wells at the Papa-Terra field in the Campos Basin and two wells for the Atlanta Phase 2 development in Block BS-4 within the Santos Basin.

Related Articles

Deepwater Installation

McDermott undertakes offshore transport and installation job at Brazilian fields

2 min read

According to the operator, this Brazilian project is still in a testing phase of production and automation systems. As a result, fluctuations in daily production figures are expected during this period. Brava expects to achieve a production and operational efficiency peak for the asset during the coming months.

The FPSO Atlanta, now connected to six wells, is expected to work its way up to ten wells in 2029. This unit is chartered and operated by Malaysia’s Yinson Production .

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Fossil EnergyFPSO & VesselsOil & GasBusiness & FinanceBusiness Developments & ProjectsExploration & Production

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1SED Energy Holdings and Ventura Offshore to unite into one
  2. 2New Boskalis rock installation vessel starts work offshore Poland
  3. 321 companies apply for Norway’s new oil & gas exploration areas
  4. 4Spanish shipyard launches its largest-ever vessel, built for Østensjø Rederi

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free