Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Brazilian oil field months away from production peak as two more wells come back online
Business & Finance

July 22, 2025 · about 1 year ago

Brazilian oil field months away from production peak as two more wells come back online

Brazilian oil and gas player Brava Energia has returned to production mode two additional wells at an oil field off the coast of Brazil.

2 minutes read
  • LinkedIn
  • X
  • Email
FPSO Atlanta; Source: Brava Energia

Brazilian oil and gas player Brava Energia has returned to production mode two additional wells at an oil field off the coast of Brazil.

After replacing FPSO Petrojarl I , a provisional production system that worked at the Atlanta field , the FPSO Atlanta started production on December 31, 2024 , with four wells – 4H, 5H, 6H, and 7H – on stream by July 2025.

Brava enriched the output from the Atlanta field with the connection of wells 2H and 3H during the second week of this month. These wells are currently undergoing testing and a stabilization process. Both wells were previously producing through the FPSO Petrojarl I.

The restart of these wells came shortly after Brava hired McDermott to perform the transportation and installation of flexible pipelines, umbilicals, and associated subsea equipment for two new wells at the Papa-Terra field in the Campos Basin and two wells for the Atlanta Phase 2 development in Block BS-4 within the Santos Basin.

Related Article

McDermott undertakes offshore transport and installation job at Brazilian fields

According to the operator, this Brazilian project is still in a testing phase of production and automation systems. As a result, fluctuations in daily production figures are expected during this period. Brava expects to achieve a production and operational efficiency peak for the asset during the coming months.

The FPSO Atlanta, now connected to six wells, is expected to work its way up to ten wells in 2029. This unit is chartered and operated by Malaysia’s Yinson Production .

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceBusiness Developments & ProjectsExploration & Production

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

12 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

12 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

12 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

12 days ago