Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo
Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Cabling›Subsea7 takes delivery of subsea control umbilical for Belinda project
Cabling

July 28, 2025 · about 1 year ago

Subsea7 takes delivery of subsea control umbilical for Belinda project

UK-based manufacturer of subsea and power cables, JDR Cable Systems, part of TFKable Group, has completed the manufacture and load-out of a 7.4-kilometer subsea control umbilical, including subsea umbilical termination assemblies (SUTAs), for Subsea7 as part of the Serica Energy-operated Belinda pro

2 minutes read
  • LinkedIn
  • X
  • Email
JDR's subsea control umbilical
Source: JDR Cable Systems

UK-based manufacturer of subsea and power cables, JDR Cable Systems, part of TFKable Group, has completed the manufacture and load-out of a 7.4-kilometer subsea control umbilical, including subsea umbilical termination assemblies (SUTAs), for Subsea7 as part of the Serica Energy-operated Belinda project.

According to JDR Cable Systems, the umbilical was produced at JDR’s facility in Hartlepool, UK. The 11.4-meter, approximately 300-tonne reel was loaded onto self-propelled modular transporters (SPMTs), moved to the quayside, and transferred to the installation vessel.

“This achievement reflects the strength of collaboration between JDR Cables and Subsea7, and the continued commitment to safety, precision, and operational excellence. Well done to everyone involved,” JDR Cable Systems said in a social media post.

The Belinda field is located in Block 21/30i, approximately six kilometers southeast of the Triton floating production storage and offloading (FPSO) unit. Belinda was discovered in 1990 and appraised in 2016. It is being developed as a single well tieback to the Triton FPSO.

In June, JDR Cable Systems finished the type test qualifications for next-generation subsea cables designed for offshore energy applications, especially in the fixed and floating offshore wind projects, where it is expected to enable the deployment of larger turbines by doubling the electricity voltage capacity of the cable system from the industry-standard 66 kV to 132 kV.

Related Articles

Cabling

JDR makes headway with quantifications of subsea cables for offshore energy use

3 min read

More recently, the UK-based company secured a service contract with an Indian multinational enterprise engaged in engineering, Larsen & Toubro (L&T), to test 14 umbilical cables for offshore platforms in the Middle East .

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

CablingProduction & ProcessingSubseaBusiness Developments & ProjectsCollaborationEquipmentExploration & ProductionOutlook & StrategyProject & TendersTechnology

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Norwegian PSV to continue current charter for additional 100 days
  2. 2Italy’s NextGeo to open office in Germany
  3. 3TotalEnergies finds more oil off Angola, enters two exploration blocks
  4. 4Odfjell Drilling’s new rig busy until 2031 thanks to deal with Vår Energi

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free