Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo
Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Fossil Energy›All-systems-go for Odfjell Drilling-managed rig’s North Sea assignment
Fossil Energy

August 12, 2025 · about 1 year ago

All-systems-go for Odfjell Drilling-managed rig’s North Sea assignment

Equinor, a Norwegian state-owned energy giant, has received the go-ahead from the country’s authorities to undertake plug and abandonment (P&A) activities in the North Sea off the coast of Norway with a semi-submersible rig managed by Odfjell Drilling, an offshore drilling contractor.

2 minutes read
  • LinkedIn
  • X
  • Email
Deepsea Bollsta; Source: Odfjell Drilling
Deepsea Bollsta; Source: Odfjell Drilling

Equinor, a Norwegian state-owned energy giant, has received the go-ahead from the country’s authorities to undertake plug and abandonment (P&A) activities in the North Sea off the coast of Norway with a semi-submersible rig managed by Odfjell Drilling, an offshore drilling contractor.

The Norwegian Ocean Industry Authority (Havtil) has granted Equinor consent to use the Deepsea Bollsta rig for permanent plugging and abandonment of wells 31/3-Q-21 and 31/2-X-23 at the Troll field in the northern part of the North Sea, where the water depth is 300-330 meters.

The 2020-built Deepsea Bollsta rig, owned by Northern Ocean (NOL), secured work on the Norwegian Continental Shelf (NCS) last year. This sixth-generation semi-submersible rig is of Moss CS60E design and can accommodate 140 people. The semi-sub can carry out operations in both benign and harsh environments at water depths of up to 3,000 meters.

Related Articles

Fossil Energy

Odfjell Drilling-managed rig going back to Europe for multimillion-dollar work in Norwegian waters

4 min read

Discovered in 1979, with the initial plan for development and operation (PDO) approved in 1986, and updated in 1990, the field came online in 1995. As a phased development was pursued for the Troll field, Phase I focused on recovering gas reserves in Troll Øst and Phase II on the oil reserves in Troll Vest .

While Troll Phase I has been developed with the Troll A fixed wellhead and compression facility with a concrete substructure, Troll Phase II was developed with the Troll B floating concrete accommodation and production facility, and the Troll C semi-submersible accommodation and production steel facility. Troll Phase III came online in 2021.

The operator decided to pursue the second stage of the Troll Phase 3 (TP3 II) project by investing over NOK 12 billion (close to $1.13 billion) to boost the gas infrastructure in the Troll West gas area to accelerate production.

Related Articles

Fossil Energy

Giant North Sea field sets ‘historic’ gas production record

4 min read

Equinor recently hired Aker Solutions to prepare the topside of the Troll C platform to receive and process production from the Fram Sør subsea tie-in, following the submission of a plan for development and operation (PDO) for the project aimed at bringing more oil and gas to Europe from the Fram and Troll area.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Fossil EnergyOil & GasRigsAuthorities & GovernmentBusiness & FinanceBusiness Developments & ProjectsExploration & ProductionRegulation & PolicyRules & Regulation

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1SED Energy Holdings and Ventura Offshore to unite into one
  2. 2New Boskalis rock installation vessel starts work offshore Poland
  3. 321 companies apply for Norway’s new oil & gas exploration areas
  4. 4Spanish shipyard launches its largest-ever vessel, built for Østensjø Rederi

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free