Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo
Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Marine Energy›US wave energy project set for September debut after full installation
Marine Energy

August 12, 2025 · about 1 year ago

US wave energy project set for September debut after full installation

Wave energy developer Eco Wave Power has completed full installation works for its U.S. pilot project at the Port of Los Angeles, marking a key step toward the first operational testing. According to Eco Wave Power, the scope included full installation of all wave energy floaters, connection of hydr

3 minutes read
  • LinkedIn
  • X
  • Email
Energy Conversion Unit and Floaters fully installed. Source: Eco Wave Power
For Illustration purposes. Source: Eco Wave Power

Wave energy developer Eco Wave Power has completed full installation works for its U.S. pilot project at the Port of Los Angeles, marking a key step toward the first operational testing.

According to Eco Wave Power, the scope included full installation of all wave energy floaters, connection of hydraulic pipes and supporting infrastructure, and placement of the energy conversion unit. C&S Welding carried out the work.

With the installation finalized, the company is now preparing for operational testing, followed by an official unveiling ceremony on September 9, 2025, at AltaSea, located at the Port of Los Angeles.

Related Articles

Marine Energy

Eco Wave Power sets launch date for first US wave energy pilot

2 min read

“Completing installation at the Port of Los Angeles marks a significant milestone in our U.S. journey,” said Inna Braverman , Founder and CEO of Eco Wave Power.

“As it will serve as a vital learning and demonstration platform for environmental surveys, regulatory engagement, and site visits by key stakeholders. It’s a showcase of how our technology can be implemented on existing marine infrastructure while advancing the path toward commercial wave energy in the United States.”

The Los Angeles station is a non-grid-connected demonstration designed to test the company’s patented technology in U.S. marine conditions, support environmental monitoring and regulatory processes with local stakeholders including the U.S. Army Corps of Engineers, act as a training and site visit hub for officials, industry representatives and potential clients, and lay the groundwork for future commercial, grid-connected projects in the U.S.

Other projects in development include a MW-scale initiative in Portugal and pilot efforts in Taiwan and India , in collaboration with local I-Ke and Bharat Petroleum.

For the Los Angeles pilot, All-Ways Metal, a California woman-owned fabrication company, produced the floaters, while C&S Welding, a Wilmington-based contractor, handled installation.

“Completing the installation is a proud moment for our team,” said Ian Crichton , President of C&S Welding.

“Eco Wave Power’s system is an exciting clean energy solution, and we’re honored to play a role in its U.S. debut.”

Eco Wave Power ’s onshore system attaches floaters to existing marine structures. The vertical motion of waves drives hydraulic cylinders, sending fluid to a land-based conversion unit that generates electricity.

The company highlights the absence of a seabed footprint and a modular, low-maintenance design as advantages for port and coastal sites. The pilot is part of its 404.7 MW global project pipeline.

In April, Eco Wave Power signed a manufacturing agreement with All-Ways Metal to produce floaters for its first U.S. wave energy installation at the Port of Los Angeles. The agreement followed key regulatory clearances, including a final license from the Port of Los Angeles granted earlier this month and a federal permit from the U.S. Army Corps of Engineers secured in November 2024.

Just a few days ago, the company installed its energy conversion unit (ECU) at the Port of Los Angeles, moving its first U.S. wave energy pilot toward initial operational testing.

Related Articles

Marine Energy

US wave energy project moves into pre-operation stage

2 min read

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Marine EnergyTidal & Wave EnergyBusiness Developments & ProjectsCollaborationEquipmentExploration & ProductionOutlook & StrategyPorts & LogisticsProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1SED Energy Holdings and Ventura Offshore to unite into one
  2. 2New Boskalis rock installation vessel starts work offshore Poland
  3. 321 companies apply for Norway’s new oil & gas exploration areas
  4. 4Spanish shipyard launches its largest-ever vessel, built for Østensjø Rederi

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free