Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Italy’s largest LNG regasification terminal to be back at full throttle by mid-month
Business & Finance

September 4, 2025 · about 10 months ago

Italy’s largest LNG regasification terminal to be back at full throttle by mid-month

Italy’s Terminale GNL Adriatico, controlled by VTTI (70%) and Snam (30%), as the operator of a liquefied natural gas (LNG) regasification terminal in the Northern Adriatic Sea, said to be the largest such asset in the Southern European country, has disclosed the timeline for the LNG terminal’s retur

2 minutes read
  • LinkedIn
  • X
  • Email
Adriatic LNG; Source: VTTI

Italy’s Terminale GNL Adriatico, controlled by VTTI (70%) and Snam (30%), as the operator of a liquefied natural gas (LNG) regasification terminal in the Northern Adriatic Sea, said to be the largest such asset in the Southern European country, has disclosed the timeline for the LNG terminal’s return to full operation in the aftermath of scheduled maintenance activities.

The Adriatic LNG regasification terminal, which has gradually resumed the send-out of gas into the national grid as of August 31, is anticipated to be back in full operation by mid-September.

The shutdown period, which started on August 1, was used for maintenance activities on the loading arms and seawater vaporizers, in line with the multi-year maintenance plan aimed at ensuring the terminal’s high reliability rate.

Simultaneously, preparatory works were undertaken on the offshore terminal to increase constant regasification capacity from 9 to 9.5 billion cubic meters per year.

The works required to increase the terminal’s capacity , which are currently underway at the Cavarzere (VE) metering station, will be completed by the end of the year.

According to the operator, the new additional capacity, already allocated for the next 20 years, will be available from the first quarter of 2026. This is interpreted to further confirm Adriatic LNG’s increasingly strategic role in ensuring Italy and Europe’s energy security.

Alessandro Conta , Chief Operating Officer of Adriatic LNG, commented: “With the unloading of the first LNG carrier yesterday—the 1,182nd since the start of terminal’s operations—we can consider this long and intense maintenance period successfully concluded.

“It has been a great team achievement, involving more than 100 technicians and engineers from our company and contractors, always carried out with the highest attention to safety and in full respect of the scheduled timeline.”

Located about 15 kilometers off the coastline of Porto Tolle (Rovigo), the LNG project was put into operation in 2009. This terminal is linked to Italy’s national distribution network through a pipeline.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceBusiness Developments & ProjectsExploration & Production

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

12 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

12 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

12 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

12 days ago