Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business Developments & Projects›Keel laid for Royal Caribbean’s fourth LNG-powered Icon-class cruise ship
Business Developments & Projects

September 9, 2025 · about 10 months ago

Keel laid for Royal Caribbean’s fourth LNG-powered Icon-class cruise ship

Finland’s Meyer Turku shipyard has held a keel laying ceremony for the fourth liquefied natural gas (LNG)-powered Icon-class cruise ship being built for U.S.-based cruise company Royal Caribbean.

2 minutes read
  • LinkedIn
  • X
  • Email
Keel laid for Royal Caribbean’s fourth LNG-powered Icon-class cruise ship

Finland’s Meyer Turku shipyard has held a keel laying ceremony for the fourth liquefied natural gas (LNG)-powered Icon-class cruise ship being built for U.S.-based cruise company Royal Caribbean. The ship, known by its working name Icon 4, has thus progressed to the hull assembly phase.

As disclosed, the traditional ceremony, held at the bottom of the building dock, included a symbolic act in which representatives of the cruise company, the classification society, and the shipyard placed coins under the first steel block to bring good luck and protection to the ship.

In the speeches, the ship project managers of Meyer Turku and Royal Caribbean noted that the cooperation is progressing well and that the lessons learned from previous sister ships are further streamlining the process.

Casimir Lindholm, CEO of Meyer Turku, commented: “Icon 4 is a very significant ship for both the shipyard and the entire partner network. With this ship, Meyer Turku is further strengthening its position as one of the world’s leading cruise ship builders. Each luxury cruise ship of this size creates 13,000 person-years of employment, and we are constantly looking for new shipbuilders to join our team at various stages from design to implementation.”

Meyer Turku delivered the first ship in the series, Icon of the Seas , in November 2023, and its sister ship, Star of the Seas , in July 2025. The third Icon, Legend of the Seas , has recently been moved to the outfitting dock and is expected to be completed in the summer of 2026.

The Icon-class ships are said to be the first in the fleet to run on natural gas. Together with features such as shore power connections and waste heat recovery systems, the vessels have been described as “pioneers in sustainable development.”

To note, Royal Caribbean has also announced an option for a fifth and sixth Icon-class ship.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business Developments & ProjectsVessels

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

11 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

11 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

11 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

11 days ago