Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business Developments & Projects›Allseas tasked with dismantling long-serving platform in UK North Sea
Business Developments & Projects

September 18, 2025 · about 10 months ago

Allseas tasked with dismantling long-serving platform in UK North Sea

Allseas has won a contract with TAQA UK for the engineering, preparation, removal, and disposal (EPRD) of a platform in the UK Central North Sea.

2 minutes read
  • LinkedIn
  • X
  • Email
Brae Alpha platform

Switzerland-headquartered offshore pipeline installation, heavy lift, and subsea construction contractor Allseas has won a decommissioning contract with the UK subsidiary of Abu Dhabi National Energy Company PJSC (TAQA) for a platform in the UK Central North Sea.

According to Allseas, its scope encompasses the engineering, preparation, removal, and disposal (EPRD) of the Brae Alpha platform. The removal of the 33,000-tonne topsides, 13,000-tonne jacket, and 34 conductors is planned between 2028 and 2032.

Located 270 kilometers northeast of Aberdeen, Brae Alpha was a cornerstone of UK offshore energy since it started producing in 1983, the Swiss player says.

TAQA took over the operatorship of the Brae area from RockRose in 2020. Based on the company’s information, the asset has produced over 636 million barrels of oil equivalent during its lifetime.

Sandy Hutchison , Managing Director of TAQA UK, said: “This milestone reinforces TAQA’s position as a leader in safe, efficient late-life asset management and decommissioning. It represents a major project for a platform that has played a significant role in the UK’s energy security over four decades.’’

Allseas’ heavy lift vessel Pioneering Spirit will carry out the removal of the topside and the upper jacket in two separate campaigns, supported by the construction vessel Oceanic . According to the Swiss player, at least 95% of recovered materials will be reused or recycled.

The Brae Area field was originally developed with three fixed jacket platforms – Alpha, Bravo, and East Brae. According to TAQA, East Brae ceased production in 2025. Brae Alpha represents the next milestone in the transition to a post-production phase.

The latest win comes three years after Allseas won a decommissioning contract in the Northern North Sea (NNS). Under it, the company was tasked with removing TAQA’s Eider Alpha, Tern Alpha, North Cormorant, and Cormorant Alpha platforms in what TAQA says is the largest single offshore decommissioning contract awarded in the UK to date.

The Brae Alpha West drilling rig and the Brae Bravo platform’s upper main jacket were also removed by TAQA in July 2022 .

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business Developments & ProjectsProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

14 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

14 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

14 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

14 days ago