Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Fossil Energy›Noble’s 2014-built drillship picks up new drilling job in Africa
Fossil Energy

September 29, 2025 · about 11 months ago

Noble’s 2014-built drillship picks up new drilling job in Africa

U.S.-headquartered offshore drilling giant Noble Corporation has won a new drilling assignment in western Africa, which one of its drillships will carry out off the coast of Ghana.

2 minutes read
  • LinkedIn
  • X
  • Email
Noble Venturer drillship; Source: Noble Corporation
Noble Venturer drillship; Source: Noble Corporation

U.S.-headquartered offshore drilling giant Noble Corporation has won a new drilling assignment in western Africa, which one of its drillships will carry out off the coast of Ghana.

While disclosing a new contract with Amni International Petroleum Development Company in Ghana for the Noble Venturer drillship, the rig owner highlights that the mobile offshore drilling unit (MODU) is expected to embark on this job once the rig is released from its current contract, which is projected to occur in late 2026 or early 2027.

Noble explains that the contract is for one exploration well with an estimated total duration of 55 days, at a day rate of $450,000. Constructed at Samsung Heavy Industries (SHI) in Korea, the 2014-built Noble Venturer drillship, which can operate in water depths of 12,000 feet, has a maximum drilling depth of 40,000 feet and can accommodate 230 people.

Blake Denton , Noble’s SVP of Marketing and Contracts, commented: “We are excited to extend our long-term presence in Ghana. We thank Amni for their trust in Noble on this important exploration campaign.”

The assignment with Amni comes after Noble shed more light on the rig’s contract with Tullow Ghana , a subsidiary of the UK-based Tullow Oil , which was due to begin in May 2025 and last for around 120 days before being suspended at zero rates until the end of 2025 to perform a planned special period survey (SPS) maintenance, including thruster replacement.

The Noble Venturer drillship is expected to continue the Tullow assignment offshore Ghana in January 2026 for about 240 days, unless the operator expands the rig’s stay.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Fossil EnergyOil & GasRigsBusiness & FinanceBusiness Developments & ProjectsProject & Tenders

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Petrobras locks in 20-year US supply from Sempra’s LNG project in Lone Star State
  2. 2Hanwha Ocean’s design solution allowing LNG carrier’s switch to ammonia gets ABS’ thumbs-up
  3. 3Exmar’s FLNG conversion earns Bureau Veritas’ seal of approval
  4. 4Denmark opens EU’s first full-scale CO2 storage site

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free