The production mode at two oil-producing assets off the coast of Brazil is weeks away from being switched off, enabling operators to undertake planned maintenance activities in their chosen Campos Basin fields.
South America’s Brava Energia has revealed that the output from its Papa-Terra field in the Campos Basin will be halted for up to 12 days to carry out scheduled maintenance during November 2025. The field’s oil production is done through two units: P-61 of the tension leg wellhead platform (TLWP) type and P-63 , which is an FPSO type, where all the production is processed.
