Fugro UST21, a joint venture between Fugro and Underwater Survey Technology 21 (UST21), has completed offshore geotechnical site investigations for Ørsted’s 1.4 GW Incheon offshore wind farm in South Korea.
Fugro’s geo-data will support the design of foundations and cable routes across the whole development area of the Incheon offshore wind project. The work covers a comprehensive scope of marine geotechnical services, including seabed cone penetration testing, downhole sampling, pressure metre testing, and laboratory analysis.
