With a capacity of 9.5 million mtpa, the Commonwealth LNG project, designed with a modular construction approach, will consist of six identical liquefaction trains using Technip Energies’ SnapLNG by T.EN modular and scalable solution.
By leveraging a single design replicated across all six trains, this is said to enable schedule acceleration and cost optimization, while offering greater predictability and certainty at scale.
