Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Drilling ops run into technical glitches, postponing production start-up
Business & Finance

December 24, 2025 · about 7 months ago

Drilling ops run into technical glitches, postponing production start-up

Akrake Petroleum, a wholly-owned subsidiary of Lime Petroleum Holding, which is an 89.74% subsidiary of Singapore’s Rex International Holding, has encountered technical difficulties during its drilling activities at a field off the coast of Benin.

2 minutes read
  • LinkedIn
  • X
  • Email
A jackup rig being transported on a vessel

Share this article

Akrake Petroleum, a wholly-owned subsidiary of Lime Petroleum Holding, which is an 89.74% subsidiary of Singapore’s Rex International Holding, has encountered technical difficulties during its drilling activities at a field off the coast of Benin.

Akrake Petroleum, as the operator, embarked on drilling operations at the first of three wells at the Sèmè field using Borr Drilling’s Gerd jack-up drilling rig in August 2025 to bring the development project in Block 1 to life.

This block covers 551 square kilometers in shallow water ranging from 20 to 30 meters. In its most recent update on the drilling activities, Rex confirmed that the drilling campaign experienced “further significant technical issues.”

As a result, the production will not take place in 2025. However, the company claims that drilling operations are continuing at the moment to attempt to resolve these issues. Akrake Petroleum Benin holds a 76% interest in the Sèmè field in Block 1 and acts as the operator.

The delivery of the mobile offshore production unit (MOPU) to Akrake and the dry docking of the floating storage and offloading (FSO) unit, contracted in April , were previously on schedule for the start of production in Q4 2025.

Discovered by Union Oil in 1969, the Sèmè field was first developed by Norway’s Saga Petroleum, producing around 22 million barrels of oil between 1982 and 1998, before production was stopped due to low oil prices in the late 1990s.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceBusiness Developments & ProjectsExploration & Production

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

11 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

11 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

11 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

11 days ago