Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Drilling ops set for April: Rig ends nearly 13K-nautical mile journey from Europe to Asia
Business & Finance

December 26, 2025 · about 7 months ago

Drilling ops set for April: Rig ends nearly 13K-nautical mile journey from Europe to Asia

Vietnam’s Petrovietnam Drilling & Well Service Corporation (PV Drilling) has confirmed the arrival of a jack-up drilling rig to Southeast Asia, where it will embark on drilling activities next year.

2 minutes read
  • LinkedIn
  • X
  • Email
PV Drilling IX drilling rig on a specialized transport ship arrived in Vung Tau, Ho Chi Minh City, on the morning of December 25, 2025; Source: PV Drilling

Share this article

Vietnam’s Petrovietnam Drilling & Well Service Corporation (PV Drilling) has confirmed the arrival of a jack-up drilling rig to Southeast Asia, where it will embark on drilling activities next year.

The PV Drilling IX , formerly Noble Highlander, jack-up drilling rig, which PV Drilling acquired from Noble, left the port of Esbjerg in Denmark on October 30, 2025, and moved to the port of Rotterdam in the Netherlands to board a specialized transport ship to make the journey to Vietnam.

The jack-up arrived in Vung Tau, Ho Chi Minh City, on December 25, 2025, completing a two-month transportation journey from Europe to Vietnam with a total distance of 12,855.6 nautical miles.

This is seen as an important milestone in the company’s restart program, opening the stage of completing the preparations before putting the rig in drilling campaigns from April 2026.

According to a representative of PV Drilling, the transportation process was implemented safely, according to plan, fully complying with international technical and maritime safety standards.

During the first restart phase in Denmark from September 2025, PV Drilling IX rig is said to have completed the inspection, operation and commissioning of many important systems and equipment as required by the ABS registry, including: safety equipment, crane systems, motors, generators and rig lifting systems.

“The key technical items are satisfactory, creating an important foundation for the rig to return to operation after a period of maintenance and technical preparation in Europe,” underlined PV Drilling, which claims that the rig will now carry out underwater testing (UWILD) and restart the second phase in three months, including an overhaul of machinery and equipment, pipeline replacement, housing upgrade, installation and commissioning.

The firm will put the jack-up into operation from April 2026, contributing to strengthening drilling capacity, and increasing the workload for drilling-related services in the Vietnamese market and the region. As a result, this is expected to boost revenue and profit of the company’s core services and its member units in 2026 and the following years.

Designed according to Friede & Goldman’s JU-2000E, the PV Drilling IX rig is capable of drilling to depths of up to 30,000 feet (9,144 meters) and operate effectively in waters up to 425 feet (129.5 meters), with the NOV BLM jacking system integrating a high degree of automation.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceBusiness Developments & ProjectsExploration & Production

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

11 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

11 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

11 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

11 days ago