Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Cabling›Prysmian’s new cable layer en route to Norway for final outfitting
Cabling

January 15, 2026 · about 8 months ago

Prysmian’s new cable layer en route to Norway for final outfitting

Vard’s shipyard in Romania has sent Prysmian’s cable-laying vessel (CLV), Alessandro Volta, to Norway, where the construction of the new CLV will be completed. The Norwegian ship designer and shipbuilder commenced construction of the cable-laying vessel in September 2024 at its shipyard in Tulcea, R

1 minutes read
  • LinkedIn
  • X
  • Email
CLV Alessandro Volta exiting Vard shipyard in Romania
Image: Video screenshot (Vard)

Vard’s shipyard in Romania has sent Prysmian’s cable-laying vessel (CLV), Alessandro Volta, to Norway, where the construction of the new CLV will be completed.

The Norwegian ship designer and shipbuilder commenced construction of the cable-laying vessel in September 2024 at its shipyard in Tulcea, Romania, where the vessel’s hull was erected in September 202 5.

Related Articles

Biofuels

New Prysmian cable layer closer to launch as hull comes together

2 min read

The vessel is now on its way to Vard Søviknes for final outfitting and completion, Vard said via social media on January 15. With a length of 192.8 meters, Prysmian’s new cable layer is the largest vessel ever launched by Vard, the shipbuilder says.

Built on the VARD 9 18 design, the vessel is purpose-designed for complex offshore power cable installation, according to the company.

Once completed, CLV Alessandro Volta will be equipped with three carousels for a total load capacity of 19,000 tons, with the system of tensioners able to sustain a maximum tension of 60 tons, and will be able to conduct the power cable lay in up to 1,500 meters of water depth.

According to information about the vessel shared earlier, the CLV is scheduled to enter commercial operation in early 2027.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

CablingOffshore WindSubseaWind FarmsVessels

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Petrobras locks in 20-year US supply from Sempra’s LNG project in Lone Star State
  2. 2Hanwha Ocean’s design solution allowing LNG carrier’s switch to ammonia gets ABS’ thumbs-up
  3. 3Exmar’s FLNG conversion earns Bureau Veritas’ seal of approval
  4. 4Denmark opens EU’s first full-scale CO2 storage site

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free