Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo
Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Fossil Energy›1990-built FPSO to keep working in Vietnam until end of 2027
Fossil Energy

February 16, 2026 · about 6 months ago

1990-built FPSO to keep working in Vietnam until end of 2027

A joint venture (JV) company of Malaysia’s MISC Group and Vietnamese PetroVietnam Technical Services Corporation (PTSC) has secured a contract that will keep a 1990-built floating production, storage, and offloading (FPSO) vessel working in Vietnam. The contract awarded to Vietnam Offshore Floating

2 minutes read
  • LinkedIn
  • X
  • Email
1990-built FPSO to keep working offshore Vietnam until end of 2027
Source: MISC Group

A joint venture (JV) company of Malaysia’s MISC Group and Vietnamese PetroVietnam Technical Services Corporation (PTSC) has secured a contract that will keep a 1990-built floating production, storage, and offloading (FPSO) vessel working in Vietnam.

The contract awarded to Vietnam Offshore Floating Terminal (Ruby) (VOFT) by Petrovietnam, Vietnam’s oil, gas and energy industry corporation, covers the lease, operation, and maintenance of the FPSO Ruby II until December 31, 2027.

This extends the operation of the unit in Vietnam, which has been operating in Blocks 01 and 02 since achieving first oil in June 2010.

The scope includes life-extension work such as equipment replacement and refurbishment, ensuring continued compliance with safety requirements throughout the contract period, MISC said.

MISC and PTSC hold 40% and 60% equity interests in VOFT, respectively.

“This contract, which extends the operation of FPSO Ruby II, is a strong endorsement of VOFT’s operational excellence, safety performance and ability to deliver sustained value from mature offshore assets. As MISC’s first offshore asset in Vietnam, FPSO Ruby II has been instrumental in establishing our presence and strengthening long-standing partnerships with Petrovietnam and PTSC,” said MISC President and Group CEO Zahid Osman .

“This aligns with MISC’s disciplined asset management strategy to secure stable cashflows from existing assets, while reflecting our broader Delivering Progress commitment to creating long-term value through safe, reliable and responsible operations. “

Ruby II is an Aframax-sized vessel designed with a production capacity of 39,000 barrels of oil per day. According to MISC, since the start of operations, the vessel operated for 5,761 days with zero lost time injuries (LTI), maintaining an uptime of 99.88% and completing 236 offtake operations, resulting in exports of over 68.5 million barrels of oil.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Fossil EnergyFPSO & VesselsOil & GasBusiness & FinanceBusiness Developments & ProjectsExploration & ProductionOutlook & StrategyProject & TendersVessels

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Norwegian PSV to continue current charter for additional 100 days
  2. 2Italy’s NextGeo to open office in Germany
  3. 3TotalEnergies finds more oil off Angola, enters two exploration blocks
  4. 4Odfjell Drilling’s new rig busy until 2031 thanks to deal with Vår Energi

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free