Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Equinor, Petoro and OMV get lucky in waters off Bergen
Business & Finance

February 16, 2026 · about 5 months ago

Equinor, Petoro and OMV get lucky in waters off Bergen

Equinor and its partners Petoro and OMV have made an oil & gas discovery some 190 kilometers northwest of Bergen, in Norway, marking the first exploration well drilled in the production license. Wildcat wells 33/12-N-3 HH and 33/12-N-3 GH were drilled in the Granat prospect near Gullfaks, in connect

1 minutes read
  • LinkedIn
  • X
  • Email
Equinor, Petoro and OMV get lucky in waters off Bergen

Equinor and its partners Petoro and OMV have made an oil & gas discovery some 190 kilometers northwest of Bergen, in Norway, marking the first exploration well drilled in the production license.

Wildcat wells 33/12-N-3 HH and 33/12-N-3 GH were drilled in the Granat prospect near Gullfaks, in connection with drilling an oil development well on the Gullfaks Satellites (33/12-N-3 IH) in production licence 152.

The discovery was made in 33/12-N-3 HH in production license 277, which was awarded in 2002 (North Sea Awards 2001).

Wildcat well 33/12-N-3 GH, which had drilling targets in production license 152 awarded in 1988, was dry.

Preliminary estimates place the Granat discovery between 0.2 and 0.6 million standard cubic meters (Sm3) of recoverable oil equivalent (o.e.), corresponding to 1.3-3.8 million barrels of o.e.

The wells were drilled from production license 050 using the 2017-built Askeladden rig.

The licensees, including Equinor as the operator, Petoro and OMV, are considering tying the discovery back to existing infrastructure in the Gullfaks area.

Wellbore 33/12-N-3 HH was plugged and abandoned after being drilled to a vertical depth of 3,275 meters due to an unstable hole. Technical sidetrack 33/12-3 HHT2 was drilled to respective measured and vertical depths of 7,846 and 3,715 meters, and was terminated in the Drake Formation.

Water depth at the site is 137 meters, and the wells have been permanently plugged and abandoned.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceBusiness Developments & ProjectsExploration & ProductionOutlook & StrategyProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

11 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

11 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

11 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

11 days ago