Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo
Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Cabling›N-Sea’s new cable layer arrives in the Netherlands for final outfitting
Cabling

February 24, 2026 · about 6 months ago

N-Sea’s new cable layer arrives in the Netherlands for final outfitting

The hull of the dual-fuel cable installation and repair vessel destined for N-Sea Group has arrived from Poland at Neptune Marine’s yard in the Netherlands. The hull of the 100-meter-long cable-laying vessel (CLV) Altera was launched early in February in Poland, after which it started its journey fr

1 minutes read
  • LinkedIn
  • X
  • Email
N-Sea’s new cable layer arrives in the Netherlands for final outfitting
Source: Neptune Marine

The hull of the dual-fuel cable installation and repair vessel destined for N-Sea Group has arrived from Poland at Neptune Marine’s yard in the Netherlands.

The hull of the 100-meter-long cable-laying vessel (CLV) Altera was launched early in February in Poland, after which it started its journey from the Polish shipyard to the Netherlands , towed by EuroTug Neptune 11.

Now located at Neptune Marine’s Merwede yard in Hardinxveld-Giessendam, the vessel’s hull and accommodation unit, constructed in the Netherlands over the past months, will be integrated.

After the integration has been completed, Altera will enter the next phase of outfitting, working towards delivery, expected in June, when it will begin its first inter-array cable installation campaign on the 1.1 GW Inch Cape offshore wind farm in Scotland.

Neptune Marine started the construction of the vessel in March 2025. UAE’s Subsea Cable Assets (SCA) has been appointed to deliver the full design, manufacturing, delivery, and commissioning of a cable installation deck spread for the CLV.

The newbuild DP2 vessel will be dual-fuel (methanol) prepared, equipped with a 25-ton offshore knuckle boom crane, mooring system and will be able to accommodate up to 99 people.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

CablingClean FuelGridMethanolOffshore WindSubseaVesselsVessels & VehiclesBusiness Developments & ProjectsOutlook & Strategy

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Hybrid electric propulsion at the heart of next-gen LNG carrier design
  2. 2Shell and MET Group pen new multi-year US LNG supply deal
  3. 3New US wave power test facility on Carnegie Clean Energy contender list for potential CETO demo
  4. 4Germany-UAE energy ties deepen as RWE, Masdar and ADNOC eye LNG supply and €3B offshore wind investment

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free