Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo
Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›News›Eco Wave Power’s pilot delivers ‘record output’ during three-meter waves
News

March 6, 2026 · about 6 months ago

Eco Wave Power’s pilot delivers ‘record output’ during three-meter waves

Eco Wave Power’s wave energy project at the Jaffa Port in Israel has achieved its highest average and peak production levels during record three-meter wave conditions. The EWP-EDF One wave energy pilot project operated for approximately nine days during February under moderate wave conditions, with

2 minutes read
  • LinkedIn
  • X
  • Email
Dorian LPG takes over newbuild dual-fuel LPG and ammonia gas carrier
PPF; Source: ConocoPhillips

Eco Wave Power’s wave energy project at the Jaffa Port in Israel has achieved its highest average and peak production levels during record three-meter wave conditions.

The EWP-EDF One wave energy pilot project operated for approximately nine days during February under moderate wave conditions, with average daily wave heights ranging between one and two meters. During these operational days, the project generated approximately 2,000 kWh of renewable electricity.

During the highest wave conditions recorded to date at the site, with waves reaching approximately three meters in height, the system achieved an average power production of approximately 20 kWh and a peak production of 56.7 kW, representing the highest average and peak production levels recorded at Jaffa Port so far, the firm noted.

“These results demonstrate the system’s ability to both withstand and operate efficiently during elevated sea states, while capturing higher energy output when wave intensity increases,” Eco Wave Power stated.

Related Articles

Marine Energy

Eco Wave Power’s pilot passes real-world sea conditions test

1 min read

The installation at Jaffa Port is a pilot-scale demonstration array, consisting of a limited number of small-scale floaters, designed primarily to validate system durability, grid integration, and real-world production performance under varying marine conditions.

The record outputs achieved during the three-meter wave events are said to provide valuable data for the engineering and optimization of future commercial-scale projects.

“February was an important month for us operationally,” said Inna Braverman , CEO and Founder of Eco Wave Power. “Not only did we continue stable production during moderate wave conditions, but we also experienced the highest waves recorded at our site to date. Achieving record average and peak power production during 3-meter wave events provides meaningful validation of our technology’s performance potential as we scale toward commercial projects.”

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

News

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1SED Energy Holdings and Ventura Offshore to unite into one
  2. 2New Boskalis rock installation vessel starts work offshore Poland
  3. 321 companies apply for Norway’s new oil & gas exploration areas
  4. 4Spanish shipyard launches its largest-ever vessel, built for Østensjø Rederi

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free