Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Subsea7 rakes in over $1.25 billion for Brazilian oil & gas job
Business & Finance

April 10, 2026 · about 3 months ago

Subsea7 rakes in over $1.25 billion for Brazilian oil & gas job

Luxembourg-domiciled Subsea7 has been tasked with work in the Santos Basin on a field development project, which is described as one of the largest pre‑salt expansion phases off the coast of Brazil.

2 minutes read
  • LinkedIn
  • X
  • Email
FPSOs P-84 (Atapu) and P-85 (Sépia) will each have a daily production capacity of 225 thousand barrels of oil per day and processing of 10 million cubic meters of gas per day; Source: Petrobras

Share this article

Luxembourg-domiciled Subsea7 has been tasked with work in the Santos Basin on a field development project, which is described as one of the largest pre‑salt expansion phases off the coast of Brazil.

Petrobras has hired Subsea7 for an offshore assignment, worth more than $1.25 billion, following a competitive tender. As a result, the firm will work on the development of the Sépia 2 field located approximately 280 kilometers southeast of Rio de Janeiro, Brazil, at a water depth of 2,170 meters in the pre-salt Santos Basin.

Yann Cottart , Senior Vice-President Brazil and Global Projects Centre West, commented: “This award strengthens Subsea7’s portfolio of projects in Brazil and reinforces our established relationship with Petrobras in the pre-salt.

“Through strong local content, disciplined execution and close collaboration, we support projects of national importance with predictable delivery. We thank Petrobras for their continued trust and look forward to the successful delivery of the Sépia 2 project.”

The deal for Sépia 2, which is perceived to play a central role in Brazil’s energy development, entails engineering, procurement, fabrication, installation, and pre-commissioning of subsea umbilicals, risers, and flowlines (SURF) for 17 wells, including two wells from the Sépia 1 project, and one gas export line with 18 risers.

Subsea7 explains that project management and engineering will begin immediately at its offices in Rio de Janeiro, Paris, and Sutton, with offshore operations scheduled to be executed from 2029. The Sépia field has been producing since 2021 through the FPSO Carioca , with a production capacity of 180,000 bopd.

The second development phase, Sépia-2, will entail the FPSO P-85 with a 225,000 bopd capacity. The contract with Subsea7 comes months after SLB won a deal to provide services and technology for up to 35 ultra-deepwater wells, which are part of Petrobras’ second development of the Atapu and Sépia fields.

Seatrium picked up an $8.15-billion contract in 2024 for the field duo’s two ‘all-electric’ FPSOs, which are expected to cut the emissions footprint by 30% per barrel of oil produced once they come online in 2029, using electrically driven compressors and motors to produce 165 MW power generation capacity.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceBusiness Developments & ProjectsProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

11 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

11 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

11 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

11 days ago