Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Subsea7, OneSubsea chosen for FEED at Canadian $12 billion oil project
Business & Finance

April 29, 2026 · about 2 months ago

Subsea7, OneSubsea chosen for FEED at Canadian $12 billion oil project

Subsea Integration Alliance (SIA), a strategic alliance between SLB OneSubsea and Subsea7, has won a front-end engineering design (FEED) contract with Norwegian state-owned energy firm Equinor for a deepwater oil project offshore Canada. The FEED contract for the Bay du Nord project builds on the lo

2 minutes read
  • LinkedIn
  • X
  • Email
Subsea7, OneSubsea chosen for FEED at Canadian $12 billion oil project

Subsea Integration Alliance (SIA), a strategic alliance between SLB OneSubsea and Subsea7, has won a front-end engineering design (FEED) contract with Norwegian state-owned energy firm Equinor for a deepwater oil project offshore Canada.

The FEED contract for the Bay du Nord project builds on the long-term strategic collaboration agreement SIA signed with Equinor in 2024 , which enabled early joint concept studies for this and other subsea developments.

Subsea7 and OneSubsea will work together with Equinor and the wider supply chain to mature the subsea architecture, optimize execution strategies and align engineering, procurement and delivery decisions.

“Bay du Nord is a landmark deepwater project for Equinor and for the Canadian offshore industry. Entering FEED is a decisive moment, where early engineering choices have a lasting impact on project value and executability,” said Olivier Blaringhem , Chief Executive Officer of Subsea Integration Alliance.

“Through SIA, we bring together the combined strengths of Subsea7 and OneSubsea to shape the development as an integrated system – reducing interfaces, simplifying delivery and enabling informed decisions ahead of final investment decision. This FEED award reflects Equinor’s confidence in our collaborative model and our ability to support projects of this scale and complexity while building local capability for the long-term.”

The project, situated in the Flemish Pass basin approximately 500 kilometers northeast of St. John’s, was put on a shelf for three years in 2023 because of the rise in costs. Equinor started the ball rolling at the beginning of 2025 for the project by awarding preliminary front-end engineering design (pre-FEED) work to BW Offshore and Altera Infrastructure.

The final investment decision (FID) is expected in the next couple of years and the first oil as early as late 2028.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceBusiness Developments & ProjectsExploration & ProductionOutlook & StrategyProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

10 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

10 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

10 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

10 days ago