Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›CRP Subsea to supply cable protection systems for East Anglia Two offshore wind farm
Business & Finance

May 28, 2026 · about 2 months ago

CRP Subsea to supply cable protection systems for East Anglia Two offshore wind farm

UK-based CRP Subsea has secured a contract from Seaway7 to supply cable protection systems (CPS) for ScottishPower Renewables’ East Anglia Two offshore wind farm in the UK North Sea. Under the contract, CRP Subsea will provide 142 NjordGuard cable protection systems for inter-array cable termination

1 minutes read
  • LinkedIn
  • X
  • Email
CRP Subsea to supply cable protection systems for East Anglia Two offshore wind farm

UK-based CRP Subsea has secured a contract from Seaway7 to supply cable protection systems (CPS) for ScottishPower Renewables’ East Anglia Two offshore wind farm in the UK North Sea.

Under the contract, CRP Subsea will provide 142 NjordGuard cable protection systems for inter-array cable terminations at the project’s wind turbines. The systems are designed to protect the cables against over-bending, abrasion and fatigue during installation and operations, CRP Subsea said, and added that three different CPS configurations will be engineered for monopile and J-tube interface applications.

The company’s NjordGuard systems will be manufactured at CRP Subsea’s facility in north-west England, with project engineering already underway and final deliveries scheduled for February 2027.

Seaway7 secured a transport and installation contract for East Anglia Two inter-array cables in 2024, and contracted Hellenic Cables for the supply of the inter-array cables in 2025.

East Anglia Two forms part of ScottishPower Renewables’ wider East Anglia Hub alongside East Anglia One North and East Anglia Three. The 960 MW project will comprise 64 Siemens Gamesa SG 14-236 DD wind turbines installed around 46 kilometers off the coast of Lowestoft.

East Anglia Hub is among the UK’s largest offshore wind developments, with a combined capacity of around 2.9 GW.

East Anglia Three is currently under construction, with the first turbines installed. The installation of inter-array cables on East Anglia Three has also been carried out by Seaway7.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

10 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

10 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

10 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

10 days ago