Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Home›News›Ballast Nedam: Heavy Lift Vessel Svanen at Work for Belwind
News

September 2, 2009 · about 17 years ago

Ballast Nedam: Heavy Lift Vessel Svanen at Work for Belwind

Ballast Nedam’s heavy lift vessel Svanen left the port of Rotterdam last weekend. The Svanen has been commissioned by Van Oord Dredging and Marine Contractors to drive 56 steel piles for the foundations of the Belwind offshore wind farm off the coast of Zeebrugge (Belgium). This is the first phase o

1 minutes read
  • LinkedIn
  • X
  • Email

Ballast Nedam’s heavy lift vessel Svanen left the port of Rotterdam last weekend. The Svanen has been commissioned by Van Oord Dredging and Marine Contractors to drive 56 steel piles for the foundations of the Belwind offshore wind farm off the coast of Zeebrugge (Belgium). This is the first phase of the Belwind project, which will eventually encompass a total of 110 wind turbines.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

News

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Jan De Nul makes its entrance into CCS market with North Sea pipeline project
  2. 2Floatel’s 2016-built semi-submersible vessel lines up Brazilian job
  3. 3PTTEP, Petronas’ 35-year gas deals bolster Thailand-Malaysia energy security axis
  4. 4Well-Safe and NMC Energy join forces for North Sea decommissioning push

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free