Twelve months after the keel laying of the trailing suction hopper dredger Leiv Eiriksson at Construcciones Navales del Norte in Sestao, Spain, the vessel was launched on 4 September.
The mega hopper, with a capacity of 46,000m³ , is a sister vessel to Cristóbal Colón.