Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Home›News›Two more windfarm platform topsides for Heerema Hartlepool
News

December 2, 2009 · about 16 years ago

Two more windfarm platform topsides for Heerema Hartlepool

Heerema Hartlepool, one of the fabrication locations of Heerema Fabrication Group (HFG), has been awarded a contract to fabricate and load out two substation platform topsides for the Sheringham Shoal Offshore Wind Farm by AREVA T&D UK Ltd on behalf of owners Statoil (formerly StatoilHydro) and Stat

1 minutes read
  • LinkedIn
  • X
  • Email

Heerema Hartlepool, one of the fabrication locations of Heerema Fabrication Group (HFG), has been awarded a contract to fabricate and load out two substation platform topsides for the Sheringham Shoal Offshore Wind Farm by AREVA T&D UK Ltd on behalf of owners Statoil (formerly StatoilHydro) and Statkraft.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

News

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Jan De Nul makes its entrance into CCS market with North Sea pipeline project
  2. 2Floatel’s 2016-built semi-submersible vessel lines up Brazilian job
  3. 3PTTEP, Petronas’ 35-year gas deals bolster Thailand-Malaysia energy security axis
  4. 4Well-Safe and NMC Energy join forces for North Sea decommissioning push

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free