Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Home›News›Vox Maxima operational
News

January 26, 2010 · about 16 years ago

Vox Maxima operational

Van Oord took receipt of trailing suction hopper dredger Vox Máxima, built by IHC Dredgers bv, on 21 January 2010. This concludes a building period of more than two years after the cutting of the first steel plates in 2007. The vessel departed for Rotterdam, where it was put to work on the Maasvlakt

1 minutes read
  • LinkedIn
  • X
  • Email

Van Oord took receipt of trailing suction hopper dredger Vox Máxima, built by IHC Dredgers bv, on 21 January 2010. This concludes a building period of more than two years after the cutting of the first steel plates in 2007. The vessel departed for Rotterdam, where it was put to work on the Maasvlakte 2 port expansion project.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

News

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Jan De Nul makes its entrance into CCS market with North Sea pipeline project
  2. 2Floatel’s 2016-built semi-submersible vessel lines up Brazilian job
  3. 3PTTEP, Petronas’ 35-year gas deals bolster Thailand-Malaysia energy security axis
  4. 4Well-Safe and NMC Energy join forces for North Sea decommissioning push

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free