Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Home›News›MPI Resolution set for crane upgrade
News

April 16, 2010 · about 16 years ago

MPI Resolution set for crane upgrade

MPI Offshore and Centrica, long-term charterers of the wind turbine installation vessel “MPI Resolution”, have reached agreement to upgrade the main crane onboard the vessel. The upgrade works will see the installation of a 600-tonne-capacity crane, which will replace the existing 300-tonne crane. T

2 minutes read
  • LinkedIn
  • X
  • Email

MPI Offshore and Centrica, long-term charterers of the wind turbine installation vessel “MPI Resolution”, have reached agreement to upgrade the main crane onboard the vessel. The upgrade works will see the installation of a 600-tonne-capacity crane, which will replace the existing 300-tonne crane. The new crane has been designed to make lifts of up to 600 tonnes and to a height of around 100 metres and will prepare “MPI Resolution” for the challenges of the next generation of offshore wind farm projects.

The new crane, a state-of-the-art, all-electric, pedestal-mounted crane is currently being constructed by the Dutch-based firm Huisman Equipment B.V., located in Schiedam. The upgrade works are scheduled for completion during the first quarter of 2011, following which the 600-tonne crane will “cuts its teeth” off the UK’s Lincolnshire coast during the installation of foundation components for the Lincs Wind Farm Project, a 270MW development, eight kilometres (five miles) off the Lincolnshire coastline, east of Skegness.

Paul Gibson, Chairman of MPI Offshore said, “The upgrade of Resolution’s main crane is part of the vessel’s evolution to meet the needs of the next decade of offshore wind farm construction. This upgrade, coupled with the arrival in the North Sea of our two new build installation vessels in 2011, will serve to maintain our position as first-choice installation solution for offshore wind throughout Europe and the rest of the world.”

The year 2011 will certainly be an auspicious one for MPI Offshore. “MPI Adventure”, the first of two state-of-the art wind turbine installation vessels, currently under construction at the Cosco Nantong Shipyard in China, will arrive in European waters in the first quarter of the year. The second vessel, “MPI Discovery”, will follow during the third quarter.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

News

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Jan De Nul makes its entrance into CCS market with North Sea pipeline project
  2. 2Floatel’s 2016-built semi-submersible vessel lines up Brazilian job
  3. 3PTTEP, Petronas’ 35-year gas deals bolster Thailand-Malaysia energy security axis
  4. 4Well-Safe and NMC Energy join forces for North Sea decommissioning push

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free