Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Home›News›Successfully Absorbed Dredging Project at Holden Beach
News

May 14, 2010 · about 16 years ago

Successfully Absorbed Dredging Project at Holden Beach

The U.S. Army Corps of Engineers just completed an $800,000 dredging, navigation and beach renourishment project on Holden Beach. The project removed sand from the last sand bar in the Lockwood Folly Inlet (close to the waterway) and transported the sand to the east end of the beach.

1 minutes read
  • LinkedIn
  • X
  • Email

The U.S. Army Corps of Engineers just completed an $800,000 dredging, navigation and beach renourishment project on Holden Beach. The project removed sand from the last sand bar in the Lockwood Folly Inlet (close to the waterway) and transported the sand to the east end of the beach.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

News

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Jan De Nul makes its entrance into CCS market with North Sea pipeline project
  2. 2Floatel’s 2016-built semi-submersible vessel lines up Brazilian job
  3. 3PTTEP, Petronas’ 35-year gas deals bolster Thailand-Malaysia energy security axis
  4. 4Well-Safe and NMC Energy join forces for North Sea decommissioning push

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free