Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Project & Tenders›USA: Top Kill Fails to Overcome Flow From the Well
Project & Tenders

May 30, 2010 · about 16 years ago

USA: Top Kill Fails to Overcome Flow From the Well

BP started the “top kill” operations to stop the flow of oil from the MC252 well in the Gulf of Mexico at 1300 CDT on May 26, 2010. The procedure was intended to stem the flow of oil and gas and ultimately kill the well by injecting heavy drilling fluids through the blow-out preventer on […]

1 minutes read
  • LinkedIn
  • X
  • Email

BP started the “top kill” operations to stop the flow of oil from the MC252 well in the Gulf of Mexico at 1300 CDT on May 26, 2010.

The procedure was intended to stem the flow of oil and gas and ultimately kill the well by injecting heavy drilling fluids through the blow-out preventer on the seabed, down into the well.

Despite successfully pumping a total of over 30,000 barrels of heavy mud, in three attempts at rates of up to 80 barrels a minute, and deploying a wide range of different bridging materials, the operation did not overcome the flow from the well.

The Government, together with BP, have therefore decided to move to the next step in the subsea operations, the deployment of the Lower Marine Riser Package (LMRP) Cap Containment System.

Drilling of the first relief well continues and is currently at 12,090 feet. Drilling of the second relief well is temporarily suspended and is expected to recommence shortly from 8,576 feet.

[mappress]

Source:BP, May 30, 2010;

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Project & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

11 days ago

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

11 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

11 days ago
Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

11 days ago