Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Home›News›USACE Proposes Maintenance Dredging on Mississippi River (USA)
News

June 30, 2010 · about 16 years ago

USACE Proposes Maintenance Dredging on Mississippi River (USA)

The maintenace dredging work consists of furnishing one hydraulic pipeline dredge and attendant plant necessary for the removal and satisfactory disposal of shoal material from the lower Mississippi River and Southwest Pass within the limits of work. The estimated time of completion is 135 calendar

1 minutes read
  • LinkedIn
  • X
  • Email

The maintenace dredging work consists of furnishing one hydraulic pipeline dredge and attendant plant necessary for the removal and satisfactory disposal of shoal material from the lower Mississippi River and Southwest Pass within the limits of work.

The estimated time of completion is 135 calendar days.

Estimated price range is between $5 million and $10 million.

[mappress]

Source: fbo.gov, July 1, 2010

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

News

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Jan De Nul makes its entrance into CCS market with North Sea pipeline project
  2. 2Floatel’s 2016-built semi-submersible vessel lines up Brazilian job
  3. 3PTTEP, Petronas’ 35-year gas deals bolster Thailand-Malaysia energy security axis
  4. 4Well-Safe and NMC Energy join forces for North Sea decommissioning push

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free