Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Home›News›USA: MC252 Well Reaches Static Condition; Well Monitoring Underway
News

August 4, 2010 · about 16 years ago

USA: MC252 Well Reaches Static Condition; Well Monitoring Underway

BP announced today that the MC252 well appears to have reached a static condition — a significant milestone. The well pressure is now being controlled by the hydrostatic pressure of the drilling mud, which is the desired outcome of the static kill procedure carried out yesterday (US Central time). P

2 minutes read
  • LinkedIn
  • X
  • Email

BP announced today that the MC252 well appears to have reached a static condition — a significant milestone. The well pressure is now being controlled by the hydrostatic pressure of the drilling mud, which is the desired outcome of the static kill procedure carried out yesterday (US Central time).

Pumping of heavy drilling mud into the well from vessels on the surface began at 1500 CDT (2100 BST) on August 3, 2010 and was stopped after about eight hours of pumping. The well is now being monitored, per the agreed procedure, to ensure it remains static. Further pumping of mud may or may not be required depending on results observed during monitoring.

The start of the static kill was based on the results of an injectivity test, which immediately preceded the static kill and lasted about two hours.

BP will continue to work with the National Incident Commander and other government officials to determine the next course of action, which involves assessing whether to inject cement in the well via the same route.

The aim of these procedures is to assist with the strategy to kill and isolate the well, and will complement the upcoming relief well operation, which will continue as per plan.

A relief well remains the ultimate solution to kill and permanently cement the well. The first relief well, which started May 2, has set its final 9 7/8-inch casing. Operations on the relief wells are suspended during static kill operations. Depending upon weather conditions, mid-August is the current estimate of the most likely date by which the first relief well will intercept the Macondo well annulus, and kill and cement operations commence.

[mappress]

Source: BP, August 4, 2010:

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

News

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Jan De Nul makes its entrance into CCS market with North Sea pipeline project
  2. 2Floatel’s 2016-built semi-submersible vessel lines up Brazilian job
  3. 3PTTEP, Petronas’ 35-year gas deals bolster Thailand-Malaysia energy security axis
  4. 4Well-Safe and NMC Energy join forces for North Sea decommissioning push

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free