Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Home›News›Juliet set for Amethyst tie-back
News

August 11, 2010 · about 16 years ago

Juliet set for Amethyst tie-back

Juliet GDF Suez aims to tap its UK North Sea Juliet gas field discovery with a tieback to the BP Amethyst platform. Juliet discovered with the 47/14b-10 well drilled in 2008, which flowed at 38 Mmcf/d of gas from a 6 metre (20 ft) interval on test, is to be tapped via a two subsea […]

1 minutes read
  • LinkedIn
  • X
  • Email

Juliet GDF Suez aims to tap its UK North Sea Juliet gas field discovery with a tieback to the BP Amethyst platform. Juliet discovered with the 47/14b-10 well drilled in 2008, which flowed at 38 Mmcf/d of gas from a 6 metre (20 ft) interval on test, is to be tapped via a two subsea wells and a 10-inch export pipeline and umbilical line to the BP-operated Amethyst 2D platform which lies 9 km (5.6 miles) north, according to information seen by Offshore247.com.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

News

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Jan De Nul makes its entrance into CCS market with North Sea pipeline project
  2. 2Floatel’s 2016-built semi-submersible vessel lines up Brazilian job
  3. 3PTTEP, Petronas’ 35-year gas deals bolster Thailand-Malaysia energy security axis
  4. 4Well-Safe and NMC Energy join forces for North Sea decommissioning push

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free