Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Home›News›Canada: C-NLOPB Approves Corridor Resources Geohazard Survey Program
News

October 5, 2010 · about 16 years ago

Canada: C-NLOPB Approves Corridor Resources Geohazard Survey Program

The C-NLOPB has approved an application by Corridor Resources Inc. to conduct a geohazard survey in the Maritimes Basin in the Gulf of St. Lawrence. The geohazard survey, which includes a four-day low energy seismic survey, will take approximately six days to complete. The mitigative measures that C

2 minutes read
  • LinkedIn
  • X
  • Email

The C-NLOPB has approved an application by Corridor Resources Inc. to conduct a geohazard survey in the Maritimes Basin in the Gulf of St. Lawrence. The geohazard survey, which includes a four-day low energy seismic survey, will take approximately six days to complete.

The mitigative measures that Corridor must implement include, but are not limited to, gradual start of the seismic airgun array to discourage marine mammals from staying in the immediate area. Also, Corridor must ensure that the seismic airgun array is shut down if a marine mammal, or sea turtle listed as Endangered or Threatened pursuant to the Species at Risk Act, is observed in the safety zone.

In consideration of concerns expressed by some members of the public concerning the Application, the Board is applying an additional level of regulatory oversight to the proposed program, beyond that typically applied to marine geohazard surveys. The Board has requested of the Fish, Food, and Allied Workers (FFAW) Union that its Fisheries Liaison Officer (FLO) aboard the survey vessel act on behalf of C-NLOPB during the program in monitoring the proper implementation of mitigative measures applicable to the survey. The FLO has training as a Marine Mammal Observer and the FFAW will provide a report to C-NLOPB following conclusion of the survey.

As part of the environmental assessment process, the C-NLOPB consulted with experts at Fisheries and Oceans Canada, Environment Canada and other government agencies to advise on the possible environmental implications of the project. Corridor Resources held consultations with stakeholders who may be affected by program activities and reported the results to the C-NLOPB.

The C-NLOPB and its advising agencies are collectively satisfied with the company’s response and Corridor Resources Inc. has been notified of the results of the assessment. The environmental assessment has concluded that, with the application of mitigation measures, the project is not likely to result in any significant adverse environmental effects.

[mappress]

Source: C-NLOPB,October 5, 2010,

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

News

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Ventura Offshore adds deepwater firepower to managed fleet and wins Petronas rig deal
  2. 2Boost for Europe’s energy diversification and cross-border gas flows as Western Balkans plug into Vertical Corridor
  3. 3NKT inaugurates expanded power cable factory in Denmark
  4. 4OneSubsea to support Azule Energy’s production shift from aging to new FPSO

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free