Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Project & Tenders›Mott MacDonald Carries Out Power System Studies in Papua New Guinea
Project & Tenders

November 11, 2010 · about 15 years ago

Mott MacDonald Carries Out Power System Studies in Papua New Guinea

Mott MacDonald has been appointed by Chiyoda – JGC Joint Venture to carry out power system studies to support the development of gas fields in Papua New Guinea throughout the engineering, procurement and construction phase. The project, known as PNG LNG, is an integrated development which includes g

2 minutes read
  • LinkedIn
  • X
  • Email

Mott MacDonald has been appointed by Chiyoda – JGC Joint Venture to carry out power system studies to support the development of gas fields in Papua New Guinea throughout the engineering, procurement and construction phase.

The project, known as PNG LNG, is an integrated development which includes gas production and processing facilities in Papua New Guinea.

The PNG LNG project will develop gas fields in the Southern and Western Highlands of Papua New Guinea and transfer the gas via a pipeline to a two-train liquefied natural gas (LNG) facility which will be constructed near the capital Port Moresby.

The total combined capacity of the facility will be 6.3 million tonnes of LNG per year. There will be over 700 kilometers (450 miles) of pipelines connecting the facilities.

Mott MacDonald will perform a comprehensive series of power system studies. These will include advising on potential operational constraints as well as obsolescence of equipment, in addition to providing settings for the protection relays that will be installed on the plant once it is built.

Mott MacDonald previously provided support to Chiyoda during the initial front-end engineering and design (FEED) phase of the project in 2009.

Kathleen Clark, Mott MacDonald’s project director said, “We are delighted to be part of this project. Mott MacDonald ranks among the world leaders in engineering consultancy and offers a wealth of experience in developing power projects around the globe. We look forward to bringing our expertise to this project in Papua New Guinea.”

The project will progress in a series of development phases with the first LNG deliveries scheduled to begin in 2014. The capital value of the project is estimated to be around US$15 billion.

[mappress]

Source: Mott MacDonald, November 11, 2010;

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Project & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

12 days ago

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

12 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

12 days ago
Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

12 days ago