Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Norway: Statoil Takes Time-out from Gullfaks Drilling Operations
Business & Finance

November 11, 2010 · about 15 years ago

Norway: Statoil Takes Time-out from Gullfaks Drilling Operations

On Wednesday November 10, Statoil decided to halt the drilling operations that were underway at the Gullfaks field in the North Sea. The drilling and well operations were stopped at Gullfaks for an additional review of Statoil’s routines for planning and conducting drilling operations. On Friday Oct

1 minutes read
  • LinkedIn
  • X
  • Email

On Wednesday November 10, Statoil decided to halt the drilling operations that were underway at the Gullfaks field in the North Sea.

The drilling and well operations were stopped at Gullfaks for an additional review of Statoil’s routines for planning and conducting drilling operations.

On Friday October 29, Statoil presented the report from its own internal investigation after the incident involving the Gullfaks well C-06 on May 20. After the report’s publication, Statoil and the Petroleum Safety Authority of Norway (Ptil) have maintained a dialogue on the contents of the report, and Ptil’s own inspection.

“We wish to double-check that the ongoing drilling and well operations are in accordance with Statoil’s procedures and the short term measures that were identified in our internal investigation after the C-06 incident,” says senior vice president of Drilling and Well, Geir Slora.

A controlled shut-down of drilling and well operations is now being conducted at the field.

Production is continuing as normal from the Gullfaks field and associated satellite fields.

“We are continuing our dialogue with Ptil and will recommence drilling and well operations as soon as possible,” says Slora.

[mappress]

Source: Statoil, November 11, 2010;

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & Finance

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

16 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

16 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

16 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

16 days ago