Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Norway: Statoil Awards Contracts for tie-back of PanPandora and Katla
Business & Finance

November 14, 2010 · about 15 years ago

Norway: Statoil Awards Contracts for tie-back of PanPandora and Katla

Two contracts worth around USD 90 million have been awarded to Subsea 7. These are EPCI contracts, which include engineering, procurement, construction and installation of the pipelines and control cables connecting the PanPandora and Katla fields in the North Sea to existing production systems. The

2 minutes read
  • LinkedIn
  • X
  • Email

Two contracts worth around USD 90 million have been awarded to Subsea 7.

These are EPCI contracts, which include engineering, procurement, construction and installation of the pipelines and control cables connecting the PanPandora and Katla fields in the North Sea to existing production systems. The contracts also cover installation of the production system on the seabed. They are the first contracts signed by Statoil for delivery of subsea pipes to the new portfolio of fast-track developments.

“The purpose of fast-track developments is to realise small finds that would generally not be profitable,” says Per Haaland, head of the portfolio of fast-track developments on the Norwegian continental shelf (NCS). “This part of the portfolio helps maintain the production level on the NCS.”

The engineering work starts this month at the supplier’s office in Stavanger. The pipelines will be produced at the spool base on the island of Vigra on the west coast of Norway. Field installation and pipe-laying on the seabed are scheduled for the first half of 2012. Production from PanPandora and Katla is to start later the same year.

“We are signing these contracts earlier than what is normal for traditional project execution,” says Vidar Birkeland, acting head of procurements. “They are important contributions to maintaining the pace of our fast-track projects. Furthermore, Subsea 7 has vessels that are well suited for this work.”

Facts about the Fields and the fast track commitment

Katla

Normal 0 21 false false false BS-LATN-BA X-NONE X-NONE

[mappress]

Source: Statoil , November 14 , 2010

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & Finance

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

16 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

16 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

16 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

16 days ago