Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Project & Tenders›CB&I Awarded Feed Contract for Shtokman LNG Export Terminal Project (Russia)
Project & Tenders

November 16, 2010 · about 15 years ago

CB&I Awarded Feed Contract for Shtokman LNG Export Terminal Project (Russia)

CB&I announced today that CB&I Lummus has been awarded a contract for the front-end engineering & design (FEED) services for the Shtokman LNG storage and loading facility at the sea port in Terriberka in the Murmansk region of the Russian Federation. The sea port is part of the Shtokman Gas-Condensa

1 minutes read
  • LinkedIn
  • X
  • Email

CB&I announced today that CB&I Lummus has been awarded a contract for the front-end engineering & design (FEED) services for the Shtokman LNG storage and loading facility at the sea port in Terriberka in the Murmansk region of the Russian Federation.

The sea port is part of the Shtokman Gas-Condensate Field Development Project developed by Gazprom Dobycha Shelf LLC, a fully owned subsidiary of Gazprom JSC. CB&I’s contract, which is scheduled for completion in 2011, has been awarded by Giprospetsgas JSC, the project general designer.

The value of the contract was not disclosed. The Shtokman Gas-Condensate Field Development Project consists of the production, treatment, transportation, liquefaction, storage and shipping of natural gas and natural gas liquids from the Shtokman field located 600 km offshore in the Barents Sea, north of Kola Peninsula, Russia.

The field has an estimated 3.9 trillion cubic meters of natural gas reserves. CB&I’s project scope includes concept and FEED development of the LNG storage and loading facility, including multiple 160,000 cubic meter full containment LNG storage tanks and the associated process piping and loading facilities.

Concept and FEED development will provide the project schedule and cost estimates for the engineering, procurement and construction phase. CB&I will also prepare the Russian design dossier (Proyekt) in accordance with regulatory requirements.

[mappress]

Source: CB&I , November 17, 2010;

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Project & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

12 days ago

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

12 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

12 days ago
Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

12 days ago