Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Green Marine›UAE: Drydocks World Renews Semi Submersible Crane Vessel Hermod
Green Marine

April 28, 2011 · about 15 years ago

UAE: Drydocks World Renews Semi Submersible Crane Vessel Hermod

Drydocks World will carry out refurbishment worth $3.3m onboard semi-submersible crane vessel Hermod belonging to Dutch company Heerema Marine Contractors, a service provider in the offshore oil and gas industry. The ship is 154 m long and 86 m wide and is one of the largest in operation. Its draft

2 minutes read
  • LinkedIn
  • X
  • Email

Drydocks World will carry out refurbishment worth $3.3m onboard semi-submersible crane vessel Hermod belonging to Dutch company Heerema Marine Contractors, a service provider in the offshore oil and gas industry. The ship is 154 m long and 86 m wide and is one of the largest in operation.

Its draft is 10.5 – 28.2 m depending on whether water has been taken in. The Hermod is capable of a tandem lift of 8,100 tonnes and has been employed on several record breaking projects in harsh North Sea environments.

“We are confident that with proven technical capabilities and our new streamlined production process, we will be able to achieve significant value addition to challenging projects of this nature. Our longstanding valuable experience and technical competence is a constant draw for projects of a sophisticated nature and our repair and refurbishment abilities have been widely acknowledged around the globe. We have built a commendable list of clientele, which we plan to expand during the course of the year,” said Khamis Juma Buamim , Chairman of Drydocks World and Maritime World.

The vessel arrived at Drydocks World’s Dubai shipyard on 1 April 2011 and the works will be completed by mid-May. The broad work scope includes, replacement of wooden fenders by steel half-pipe fenders, steel renewal totaling around 10 km of welding), coating of external hull including floaters and columns, overhaul of electric motors in the crane, replacement of hydraulic pipes, repair of ballast & cooling water pipes and bearings in the 4000-tonne crane block. In addition, maintenance of fair leads, ballast valves, bow thruster, removal of rudders and undertaking a shafts survey and renovation of sanitary spaces will be carried out.

[mappress]

Source: DrydocksWorld, April 28, 2011.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Green MarineNews

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1QatarEnergy’s CEO: Repairs on damaged LNG trains to take three years
  2. 2Remote operations center for unmanned survey operations opens in Singapore
  3. 3Australian oil & gas firm makes its first foray into Liberia’s deepwater arena
  4. 4Brazilian subsea services provider changes hands

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free