Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Green Marine›Brazil: Superpesa Shipyard Starts Construction of Bunker Ships for Promef
Green Marine

April 29, 2011 · about 15 years ago

Brazil: Superpesa Shipyard Starts Construction of Bunker Ships for Promef

The construction of the first of the three bunker-type ships ordered by the Fleet Modernization and Expansion Program (Promef) began on April 26, by the shipyard Superpesa, in Rio de Janeiro. The start of the works, celebrated with the cutting of the first steel plate, is Superpesa’s premiere in Pro

2 minutes read
  • LinkedIn
  • X
  • Email

The construction of the first of the three bunker-type ships ordered by the Fleet Modernization and Expansion Program (Promef) began on April 26, by the shipyard Superpesa, in Rio de Janeiro. The start of the works, celebrated with the cutting of the first steel plate, is Superpesa’s premiere in Promef, which already mobilizes the shipyards Ilha S.A (Eisa), Atlântico Sul (EAS), and Mauá, and anticipates the ordering of 49 vessels.

The ships ordered from Superpesa will have the purpose of refueling other vessels and, for this reason, they were designed with devices to increase their lateral mooring and maneuvering capacity. Measuring 91.85 meters in length, with a draft of 4.5 meters, each bunker ship will have a storage capacity of up to 4 thousand cubic meters of fuel oil and/or diesel oil.

Altogether, 3.6 thousand tons of steel will be used for the construction of the three ships. The first two vessels will be put to sea in 2012 and the last in 2013. The contract with the shipyard is worth R$ 110.5 million and, during the course of the works, 500 direct jobs and two thousand indirect jobs will be created.

The naval construction program of Transpetro, which is one of the mainstays of the Growth Acceleration Program (GAP), has already created over 15 thousand direct jobs in Brazil. During the course of Promef, 40 thousand direct jobs and 160 thousand indirect jobs will be created.

With the program, the expectation is that the fleet of Transpetro will exceed 110 ships in 2014. Today, Brazil is already the fourth country in number of orders placed for oil tankers in the world.

[mappress]

Source: Transpetro, April 29, 2011.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Green MarineNews

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1QatarEnergy’s CEO: Repairs on damaged LNG trains to take three years
  2. 2Remote operations center for unmanned survey operations opens in Singapore
  3. 3Australian oil & gas firm makes its first foray into Liberia’s deepwater arena
  4. 4Brazilian subsea services provider changes hands

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free