Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Subsea›USA: Ulstein and NLI Introduce New Integrated Derrick Solution at Offshore Technology Conference
Subsea

May 4, 2011 · about 15 years ago

USA: Ulstein and NLI Introduce New Integrated Derrick Solution at Offshore Technology Conference

At the OTC in Houston Ulstein Sea of Solutions and NLI introduced a new, integrated derrick solution based on existing drilling equipment, readily available in the market. With the development of the ‘Northern Light’ drilling derrick an alternative solution is provided based on proven and well known

1 minutes read
  • LinkedIn
  • X
  • Email

At the OTC in Houston Ulstein Sea of Solutions and NLI introduced a new, integrated derrick solution based on existing drilling equipment, readily available in the market.

With the development of the ‘Northern Light’ drilling derrick an alternative solution is provided based on proven and well known industry technologies to contractors and shipyards worldwide. The fully integrated derrick includes the drillfloor and substructure and can be transported, delivered and installed as one turnkey unit either from a shipyard or from NLI’s construction yard.

The derrick consists of a box beam structure with a collapsible/retractable top part to pass bridges. Pipes, cables and elevator all run inside the derrick legs, allowing for a sheltered environment, reduced maintenance costs and increased safety. As such, the derrick is very suitable to be upgraded for arctic operations.

This new derrick design uses conventional drilling equipment readily available in the market, but because of its lay-out offers a clean drillfloor and much more operational flexibility as three operations can be simultaneously performed. This is achieved by having the BOP and riser string handling outside of the derrick as is the case for X’mas tree deployment. Stand / casing building is performed within the derrick.

Integrated derrick offers clean dril floor and advanced safety and maintenance.

[mappress] Source: ULSTEIN ,May 04, 2011;

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

SubseaBusiness & FinanceEquipmentResearch & Development

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Expro lines up 14-well Canadian offshore life-extension campaign
  2. 2TotalEnergies greenlights gas project to feed one-third of Nigeria LNG train expansion
  3. 3Construction ramps up at Orkney Islands’ first link to UK mainland
  4. 4Perenco on offshore platform electrification quest to power Brazil’s shallow-water fields from shore

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free