Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›‘Oleg Strashnov’ Continues Installation of Foundations for Sheringham Shoal Wind Farm (UK)
Business & Finance

May 5, 2011 · about 15 years ago

‘Oleg Strashnov’ Continues Installation of Foundations for Sheringham Shoal Wind Farm (UK)

A new vessel will be visible off the North Norfolk coast over the coming weeks as further work continues on the installation of the foundations for the Sheringham Shoal Offshore Wind Farm. The ‘Oleg Strashnov’ is a state-of-the-art crane vessel designed for heavy lifting operations, and its key feat

2 minutes read
  • LinkedIn
  • X
  • Email

A new vessel will be visible off the North Norfolk coast over the coming weeks as further work continues on the installation of the foundations for the Sheringham Shoal Offshore Wind Farm. The ‘Oleg Strashnov’ is a state-of-the-art crane vessel designed for heavy lifting operations, and its key features include a 5000-mt fully revolving crane combined with a high sailing speed of 14 knots.

The operator of the ‘Oleg Strashnov’ is Seaway Heavy Lifting Contracting, the company which has been awarded the contract by Scira Offshore Energy Limited for the installation of the Sheringham Shoal’s two offshore substations and its remaining foundations.

Seaway Heavy Lifting has an excellent reputation for the provision of marine transportation and construction services to the offshore oil and gas industry. The ’Oleg Strashnov’, one of the company’s newest vessels, is now in the Sheringham Shoal field undertaking foundation installation. Currently 19 of the 90 foundations have been installed

Each turbine foundation comprises a tubular steel monopile topped with a bright-yellow transition piece, which will ultimately be completed with the installation of the turbines themselves. Installation of the turbines is scheduled to start in June 2011.

The two offshore substations, which will channel the energy generated by the Sheringham Shoal Offshore Wind farm to the onshore substation at Salle for distribution into the National Grid, are also soon to be installed.

The Sheringham Shoal Offshore Wind Farm is owned equally by Statoil and Statkraft through the joint venture company Scira Offshore Energy Limited. Statoil is the operator for the project during the development phase. Scira will be the operator of the wind farm.

[mappress] Source: scira,May 05, 2011;

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceOperations & Maintenance

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

12 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

12 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

12 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

12 days ago