Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Huisman Delivers New Build Pedestal Crane for ‘MPI Resolution’ Vessel (The Netherlands)
Business & Finance

May 11, 2011 · about 15 years ago

Huisman Delivers New Build Pedestal Crane for ‘MPI Resolution’ Vessel (The Netherlands)

On Tuesday 8 March 2011, Huisman, the Dutch-based specialist in lifting, drilling and subsea solutions, successfully completed the load testing of the new build 600mt Pedestal Crane onboard Wind Turbine Installation Vessel “MPI Resolution”. The load test was the final step before the crane was hande

2 minutes read
  • LinkedIn
  • X
  • Email

On Tuesday 8 March 2011, Huisman, the Dutch-based specialist in lifting, drilling and subsea solutions, successfully completed the load testing of the new build 600mt Pedestal Crane onboard Wind Turbine Installation Vessel “MPI Resolution”. The load test was the final step before the crane was handed over to the clients Centrica Renewable Energy Ltd and MPI Offshore Limited.

The crane was constructed, installed, commissioned and tested at the Huisman facility in Schiedam, The Netherlands with the final load test taking place at the Keppel Verolme yard in Rozenburg, The Netherlands. The fact that the handover took place within 15 months after signing of the first agreement was a major achievement of all parties involved.

The 600mt Pedestal Crane is custom-designed for the installation of offshore wind turbines and derives from Huisman’s many years of experience in the design, fabrication and service of heavy lifting equipment. The state-of-the-art crane combines unique technical features, such as a full electric variable frequency drive system, a low overall construction weight and a small minimum operating radius. Furthermore all the major equipment, such as hoist winches, is installed inside the enclosed crane house. This offers a good protection for the harsh marine environment.

With the new crane the MPI Resolution is prepared to handle larger wind turbine components for long term vessel charterer Centrica. The upgraded vessel is scheduled to be deployed for turbine installation operations upon the 270MW Lincs wind farm project.

Huisman has scheduled to deliver a second 600mt Pedestal Crane for another client in the fourth quarter of this year.

[mappress] Source: huismanequipment,May 11, 2011;

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceOperations & Maintenance

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

12 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

12 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

12 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

12 days ago