Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›3D Vessel Polar Duke Enters Into Production on its First Project (Norway)
Business & Finance

May 20, 2011 · about 15 years ago

3D Vessel Polar Duke Enters Into Production on its First Project (Norway)

Dolphin Group ASA announced that 3D vessel Polar Duke yesterday entered into production on her first project for TGS Nopec ASA in the Norwegian sector of the Barents Sea. Polar Duke was taken on charter in Stavanger on May 10th and mobilised directly on prospect in less than ten days and is presentl

1 minutes read
  • LinkedIn
  • X
  • Email

Dolphin Group ASA announced that 3D vessel Polar Duke yesterday entered into production on her first project for TGS Nopec ASA in the Norwegian sector of the Barents Sea.

Polar Duke was taken on charter in Stavanger on May 10th and mobilised directly on prospect in less than ten days and is presently operating with 10 streamers of 6,000 meters length.

The new purpose built vessel, has a long and slim design that allows for high transit speed and focuses on maximum fuel efficiency. She has already proven very strong towing capacity, speed, sea capabilities and exceptional manoeuvring characteristics.

Atle Jacobsen , CEO commented; “ In 5 months from establishing Dolphin Geophysical AS, we have succeeded in bringing the high capacity 3D vessel Polar Duke into operation in one of the most promising exploration areas of the world. This is a strong proof of our capabilities and an important milestone in developing Dolphin Geophysical. ”

[mappress] Source: dolphingeo,May 20, 2011;

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceOperations & MaintenanceProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Deepsea Nordkapp rig; Source: Odfjell Drilling
Business & Finance

Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year

13 days ago

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

13 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

13 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Deepsea Nordkapp rig; Source: Odfjell Drilling
Business & Finance

Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year

13 days ago
FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

13 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

13 days ago