Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Subsea›Alberto ALBERT Designs Transport of Items for USAN Deepwater Development Project (Nigeria)
Subsea

May 30, 2011 · about 15 years ago

Alberto ALBERT Designs Transport of Items for USAN Deepwater Development Project (Nigeria)

Naval Architecture and Marine Engineering Italian firm Alberto ALBERT was awarded a project to design for Logistic firm MGM Lines s.r.l. the transport of eight items for USAN Deepwater development project belonging from SAIPEM S.A USAN UFR & OLT Project. The transport, using M/V MPP SHIELD, was done

2 minutes read
  • LinkedIn
  • X
  • Email

Naval Architecture and Marine Engineering Italian firm Alberto ALBERT was awarded a project to design for Logistic firm MGM Lines s.r.l. the transport of eight items for USAN Deepwater development project belonging from SAIPEM S.A USAN UFR & OLT Project.

The transport, using M/V MPP SHIELD, was done in two phases.

The first voyage of 1800nm from Bayonne F to Arbatax I carrying four SPM top assembly weighing 33t each into the hold.

The second from Arbatax I to Port Harcourt, Nigeria, SCNL terminal carrying other four underwater Buoyancy Tanks weighing 165t each.

The second voyage of 4200nm was done carrying two Top Assembly and two Buoyancy Tanks into the hold and other two Top Assembly and two Buoyancy Tanks on the hatch covers.

As requested by tender was developed a deep analysy of the transport considering:

– the vessel description and the study of the layout on decks

– the vessel c.o.g. with cargoes on board and the relevant stability calculation

– the routing and heading analysis, the voyage duration and the study of the wave climate

– the calculation of the ship motions response by means of the ship RAOs through the actual wave climate in order to define the acceleration acting on all the items.

– the calculation of the necessary sea fastening with particular care to the items structures stress level

– the calculation of the accelerations following the wave climate and the percentage of occurrence of every sea state so to calculate the fatigue damage by means of the Miner’s law.

RINA surveyed the seafastening on both departure harbours and the transport ended successfully being the ship now on site ready to unload the items.

[mappress] Source: Alberto ALBERT , May 30, 2011

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

SubseaBusiness & FinanceEquipmentOperations & Maintenance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Expro lines up 14-well Canadian offshore life-extension campaign
  2. 2TotalEnergies greenlights gas project to feed one-third of Nigeria LNG train expansion
  3. 3Construction ramps up at Orkney Islands’ first link to UK mainland
  4. 4Perenco on offshore platform electrification quest to power Brazil’s shallow-water fields from shore

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free