Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Norway: Aibel Installs Winches for Pull-in of Risers on Statoil’s Gullfaks C Platform
Business & Finance

July 7, 2011 · about 15 years ago

Norway: Aibel Installs Winches for Pull-in of Risers on Statoil’s Gullfaks C Platform

Aibel is installing two winches for pull-in of risers on the Gullfaks C platform for Statoil. The assignment is awarded as a contract amendment. The estimated value is NOK 100 million. The winches will be used in the work with replacing the existing pipeline between Gullfaks C and Tordis, which is a

1 minutes read
  • LinkedIn
  • X
  • Email

Aibel is installing two winches for pull-in of risers on the Gullfaks C platform for Statoil. The assignment is awarded as a contract amendment. The estimated value is NOK 100 million. The winches will be used in the work with replacing the existing pipeline between Gullfaks C and Tordis, which is a fully developed subsea facility.

‘This represents another exciting project in our portfolio, and is the second one we get from Statoil this week ,’ says President and CEO Jan Skogseth in Aibel AS .

He refers to a letter of intent that Aibel received on Tuesday, regarding work worth NOK 200 million on a new test facility for subsea compressors at Kårstø.

Part of Visund South contract

In December last year Aibel was awarded a modification contract on Gullfaks C in connection with the fast-track development of the Visund South field. The new installation assignment is awarded as an amendment to this contract.

Aibel is responsible for engineering, procurement, fabrication and installation.

The project is managed from Aibel’s office in Bergen, with assistance from Haugesund, Oslo and Singapore. The project work has already started. It ends in October 2012.

[mappress] Source: Aibel, July 07, 2011;

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceOperations & MaintenanceProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

14 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

14 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

14 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

14 days ago