Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Project & Tenders›China: THEC Contracted for Reclamation Project at Wenzhou Port
Project & Tenders

July 15, 2011 · about 15 years ago

China: THEC Contracted for Reclamation Project at Wenzhou Port

CCCC Third Harbour Engineering Company Limited (THEC) won the bid for the reclamation project (deposition promotion dike of the third section) in the Zhuangyuanao area at Wenzhou Port, with a bidding amount of RMB 295 million and a construction period of 24 months.Located in the north of Zhuangyuana

1 minutes read
  • LinkedIn
  • X
  • Email

CCCC Third Harbour Engineering Company Limited (THEC) won the bid for the reclamation project (deposition promotion dike of the third section) in the Zhuangyuanao area at Wenzhou Port, with a bidding amount of RMB 295 million and a construction period of 24 months.Located in the north of Zhuangyuanao Island at Wenzhou Port, the project is a major supporting project in the port area.

The dike involved in the project has a length of 2,000 meters and a body section width of 76 to 96 meters. The crest elevation of the submerged dike is 0.2 meter and is the finished elevation. The project will help to increase the comprehensive strength of Wenzhou Port and play a positive role in changing Wenzhou from a “riverside city” into a “seaside city”.

[mappress]

Source: CCCC, July 15, 2011

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Project & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Fugro to start offshore survey program in Timor-Leste this year
Business & Finance

Fugro to start offshore survey program in Timor-Leste this year

14 days ago

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

14 days ago

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

14 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Fugro to start offshore survey program in Timor-Leste this year
Business & Finance

Fugro to start offshore survey program in Timor-Leste this year

14 days ago
WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

14 days ago
Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

14 days ago