Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Project & Tenders›The Netherlands: Maasvlakte 2 Seawall Completion Expected in January 2012
Project & Tenders

July 15, 2011 · about 15 years ago

The Netherlands: Maasvlakte 2 Seawall Completion Expected in January 2012

At the end of April, the PUMA consortium started constructing the final block dam. In May, the first blocks became visible above water. Now approximately 170 metres of the dam is ready (of a total of aro und 3,500 metres = 20,000 blocks). The highest blocks in the dam now protrude some three metres

1 minutes read
  • LinkedIn
  • X
  • Email

At the end of April, the PUMA consortium started constructing the final block dam. In May, the first blocks became visible above water. Now approximately 170 metres of the dam is ready (of a total of aro und 3,500 metres = 20,000 blocks).

The highest blocks in the dam now protrude some three metres above the water. PUMA is expecting the job to be completed in January 2012. The seawall will then be ready to withstand storms that occur only once every ten thousand years. The storm that caused so much devastation in 1953 belongs to the ‘once in 100 to 250 years’ category.

The removal of the existing block dam is also progressing well. More than 19,000 concrete blocks have been removed and transferred to a temporary store on the new hard seawall. A million tonnes of basanite has also been removed from the old block dam. Blocks and basanite will both be re-used in the new block dam.

[mappress]

Source: Maasvlakte 2, July 15, 2011

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Project & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Fugro to start offshore survey program in Timor-Leste this year
Business & Finance

Fugro to start offshore survey program in Timor-Leste this year

14 days ago

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

14 days ago

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

14 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Fugro to start offshore survey program in Timor-Leste this year
Business & Finance

Fugro to start offshore survey program in Timor-Leste this year

14 days ago
WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

14 days ago
Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

14 days ago