Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Clean Fuel›Trinidad & Tobago: BP Starts Gas Production from Serrete Field
Clean Fuel

August 26, 2011 · about 15 years ago

Trinidad & Tobago: BP Starts Gas Production from Serrete Field

BP Trinidad and Tobago today announced the start of natural gas production from the Serrette field, offshore Trinidad. Serrette is located in 280 feet (90 metres) of water off Trinidad’s south east coast. BPTT holds a 100 per cent interest in the field. Serrette is a normally unmanned installation (

2 minutes read
  • LinkedIn
  • X
  • Email

BP Trinidad and Tobago today announced the start of natural gas production from the Serrette field, offshore Trinidad. Serrette is located in 280 feet (90 metres) of water off Trinidad’s south east coast. BPTT holds a 100 per cent interest in the field.

Serrette is a normally unmanned installation (NUI). It was locally designed by Fluor Summit Engineering and constructed locally at the Trinidad Offshore Fabricators (TOFCO) yard in La Brea, south Trinidad. It is the fifth platform to be built locally using a using the standardized “clone” approach which has allowed bpTT to deliver these platforms with increased efficiency and significant local content. The Serrette platform and jacket were installed in 2010.

With Serrette, bpTT now has production from 13 offshore Trinidad platforms.

Production from Serrette is tied into bpTT’s Cassia B hub via a 26-inch diameter, 32-mile long pipeline. The platform is expected to average 400 million standard cubic feet a day (mmscfd) of gas and associated condensate from five wells. Production from this facility will supply the domestic market and Atlantic LNG’s liquefaction plant for export as LNG to international markets, such as the US and Europe.

BPTT President Norman Christie said: “The completion of Serrette demonstrates our commitment to local content. BPTT is proud to continue the tradition of local design and fabrication that we initiated with the Cannonball platform in 2001. We have also been able to refine the standardization concept by applying the lessons learned to improve design and delivery of each platform.”

[mappress] Source: BP, August 26, 2011;

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Clean FuelNews

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Technip Energies picks up assignment on Mexican LNG project
  2. 2Expansion move puts US LNG project on path for almost twofold capacity boost
  3. 3Petrobras widens its African offshore portfolio with multiple blocks in Côte d’Ivoire
  4. 4WATCH: Island Offshore’s second ocean energy construction vessel goes to Norway for completion

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free